BP Oman Khazzan Project

BP Oman Khazzan Project 
> 80
Environmental and social documents issued in the Select and FEED phases
Yes
Yes
Yes
No
No
Office: London, Pretoria, Madrid, Dubai and Muscat 
Customer: BP 
Location: Oman 
Timeframe:  
This project is BP’s largest, with 100% BP interest. Key environmental features of the project included water abstraction and treatment, wastewater (including produced water), atmospheric emissions, solid waste disposal, drilling cuttings and mud disposal, oil and chemical spills, Naturally Occurring Radioactive Material (NORM), and fracking.
WorleyParsons provided full engineering design and long lead engineering services, as well as full environmental services at the Select, FEED, and FEED follow-on stages. Environmental services throughout the above stages include: 
  • Environmental design basis
  • Environmental Modeling (air dispersion, noise, oil and chemical spill)
  • ENVIID (Environmental Issues Identification), EIA and permitting support
  • Waste management facility concept design
  • Energy use and greenhouse gas emissions forecasting
  • Environmental management and monitoring plans (waste, water, emissions, chemicals, site restoration and remediation)
  • BAT studies and Value Improvement Process (VIP)  (energy optimization, water conservation and waste minimization)
  • Environmental critical systems and equipment
  • Khazzan Project sustainability report 
  • Contaminated land (site assessment)
  • Geotechnical and GIS services
  • Water studies and infrastructure design (water abstraction,  treatment, and distribution, and wastewater treatment and disposal)

WorleyParsons demonstrated exemplary team integration, providing:

  • Significant cost saving through plant optimization process, BAT and VIPs
  • The delivery of high level of detailed design in many disciplines of the project
  • > 20 separate design and safety reviews