WorleyParsons were engaged by Sea Production (facility owner) as the consultants responsible for the integration engineering.
The integration engineering is defined as all design between the new process modules and the tie-ins to the ship systems involving piping, mechanical, process, instrumentation, electrical and structural disciplines.
The FPSO was installed in 100m water depth at AEDs Puffin Oilfield in the Timor Sea, offshore northwest Australia.