The Mackenzie Gas facilities include production pads at three locations, compressor stations, a gathering system, a process plant, a high pressure system to transport the gas to Norman Wells, a liquids pipeline to Norman Wells and a natural gas mainline running south to the Alberta border. The total length of the pipeline system was approximately 1200 km.
Colt WorleyParsons in joint venture with KBR provided engineering services for conceptual and preliminary engineering of the Mackenzie Pipeline Project and supported the regulatory applications process.