North Rankin 2 Project

 
25,000
tonne float-over topside
No
Yes
Yes
Yes
No
Office: Perth, Leatherhead, Beijing 
Customer: Woodside Energy Limited 
Location: North West Shelf, Australia 
Timeframe: 2006 - 2007 
The North Rankin 2 Project is the largest current investment offshore Australia.

 Planned for installation in 2010 , NRB will unlock low-pressure reserves from the North Rankin and Perseus offshore gas and condensate fields and, hence, ensure gas supply to the North West Shelf onshore liquefied natural gas production facilities. The new platform will be linked to the existing NRA platform and provide gas compression and condensate pumping for the fluids produced from the NRA wells.

The NRB platform consists of one of the world’s largest integrated topsides installed by the float-over method. The 20,000+ tonne steel substructure (located in a water depth of 130m) must resist cyclonic storm wave heights of over 25m placing in one of the worlds most severe operating climates.

WorleyParsons is providing the EPCM services for both the new platform (in joint venture with KBR) and also for the significant modifications / life extension to the existing NRA platform (in joint venture with Transfield Services).